TESTING:
- GROUNDCONDUCTOR EFFICIENCY
- INSULATION RESISTANCE MEASUREMENT
- DIELECTRIC STRENGTH TEST
- LEAKAGE CURRENT
- FUNCTIONAL MEASUREMENTS. THE FOLLOWING ARE MEASURED: V – A – W – POWER FACTOR.
OPTIONS:
- 42-column printer
- Air conditioning
- 50/60 Hz frequency converter
- Connection box
- Start capacitor box